-
Recent Posts
January 2012 M T W T F S S « Dec 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Archives
Blogroll
diva 200
ISMA400_assignment #3
I finish to make three paths. If I feel like I missed something I would like to fix before the deadline.
1. path (The way)
2. path (building with False Creek)
3. path (following the sea)
Posted in Uncategorized
I tried different ways to make the shape that I want but I failed. I don’t like the shape, so I am going to use different material and different shape.
Posted in Uncategorized
ISMA 400_experimental

Simulating how it looks like when the light goes under the bag. 
Put wire inside of the bags.

The wires are keep moving around the bags.
I take out the wire from the bags and tape the bags on the corset.
It is going to be finish by this week.
Posted in Uncategorized
ISMA 400_ Generate a QR code
Posted in Uncategorized
ISMA 400_Maraya Project
I tried to upload my own photo but it does not work. Other then one photo I can not upload; hence, I changed the resolution of the photos, but does not work.
*My paths: http://marayaprojects.com/user
*photos : http://www.facebook.com/media/set/?set=a.10150999434100173.776117.839305172&type=3
Posted in Uncategorized







